Our Exclusive
CIM Case Studies
Asphalt
Lagoon
The preparatory work consisted of pressure washing the asphalt to clean the surface and remove the deteriorated sub- state...
Bolted Steel
Leachate Tank
The first step of installation required that the existing coating be prepared...
Assima Tower – Kuwait
The Assima development consists of a 300m high 55 storey office tower and...
Belgium Brewery
Waste Tank
Single coat application reducing downtime, back in service in 48 hours, crack bridging and filling capability...
Concrete
Wastewater Tank
The preparatory work consisted of pressure washing the asphalt to clean the surface...
Fountains: World
Trade Center
The Assima development consists of a 300m high 55 storey office tower and...
Potable
Watertank Liner
Groundwater contamination posed a threat to the Elizabethtown...
Potable
Water Reservoir
First, the concrete on interior reservoir walls was sand blasted and cleaned...
Water Feature
Applications
The CIM waterproofing system is a two-component asphalt-modified...
Parking Deck
Waterproofing
ance product that is durable and suitable for ponding water since would not have access...
Cooling
Tower
After 11 years after application, there are no signs of coating disintegration..
Planters,
Decks, & Roofs
The CIM waterproofing system is a two-component asphalt-modified...